Intelligent Data Capture & Schedule-Linking Layer for Infrastructure Project Management: Real-Time Actual Progress Tracking (Planning-to-Execution Bridge)

Ministry / Organization: Oil India Limited
Technical Complexity
8/10
Dataset Accessibility
7/10
36h Hackathon Viability
9/10
Step 0 • Zero-Jargon Layman Summary

“Large infrastructure projects like oil refineries have detailed plans, but site workers report progress using messy, inconsistent notes that don't match the official schedule. This system acts as a digital translator that reads these messy updates and automatically updates the master project plan in real-time.”

The DecodeX PS Decoder™

Deconstructed Problem Blueprint

Step 1

WHAT TO BUILD?

An intelligent middleware platform that acts as a bridge between unstructured field data (voice, text, spreadsheets) and structured project management software (Primavera/MS Project).

Step 2

WHO IS IT FOR?

Primary: Site supervisors and contractors. Secondary: Project managers and planners at Oil India Limited.

Step 3

WHY DOES IT EXIST?

Current reporting is manual, fragmented, and disconnected from the master schedule, leading to 'data silos' where project managers don't know the true status of work until it's too late to fix delays.

Step 4

INPUT → PROCESS → OUTPUT ARCHITECTURE PIPELINE

01 • Inputs & Telemetry

Daily progress reports (PDF/Word), discipline-specific spreadsheets (Excel/CSV), scanned site diaries (OCR), and voice-to-text inputs from supervisors.

02 • Processing & AI Core

LLM-based entity extraction, fuzzy string matching against WBS (Work Breakdown Structure) codes, confidence-scoring, and automated API-based schedule synchronization.

03 • Actionable Deliverables

Real-time dashboard updates, automated progress alerts, discrepancy reports for planners, and a structured historical database of project execution patterns.

Step 5

CONSTRAINTS

  • Must handle offline-first data entry for remote sites.
  • Must support fuzzy matching for non-standardized industry terminology.
  • Must maintain a strict audit trail for every automated schedule update.
  • Must work with synthetic data since live project data is restricted.
Step 6

JURY METRICS

  • Fuzzy matching accuracy (Precision/Recall).
  • Time-to-update (latency from report submission to schedule reflection).
  • User friction score (number of clicks/seconds to log an activity).
  • Percentage of unmatched activities flagged for manual review.
Step 7

CORE BOTTLENECK

The 'Semantic Gap': Mapping colloquial site language (e.g., 'finished welding joint 4') to formal, rigid WBS codes (e.g., 'ACT-PIP-004-WLD') with high confidence.

Why You Should Choose This PS (Pros)

  • High industrial relevance for Oil & Gas sector.
  • Clear, measurable problem with a direct ROI for the organization.
  • Strong potential for AI/LLM integration to show technical depth.

Challenges & Risks to Watch (Cons)

  • Requires deep domain understanding of project management (Primavera/WBS).
  • Risk of 'hallucination' in LLM-based mapping if not properly constrained.
  • Integration with legacy PMIS software can be complex.
Hackathon Blueprint

Recommended Tech Stack & Grand Finale Features

Frontend & Mobile
React.jsShadcn UILucide Icons
Backend & APIs
FastAPIPythonCelery for background tasks
AI / ML & Models
Llama-3.1-8B or GPT-4o-mini for extractionSentence-Transformers for semantic search/fuzzy matchingTesseract/EasyOCR for document ingestion
Database & Cloud
PostgreSQLpgvector for semantic searchRedis

Killer Features to Impress the SIH Jury

Confidence-based 'Human-in-the-loop' dashboard where the AI only auto-updates high-confidence matches.
Voice-to-WBS agent that understands site-slang and converts it to professional project status updates.
Project 'Black Box' analytics: A queryable database that predicts future delays based on historical 'actual' vs 'planned' durations.
Offline-sync capability using PWA (Progressive Web App) technology.
View Official SIH 2026 Portal Raw Text
▼
•Background Infrastructure project schedules cascade from macro milestones (L1) down to micro, executable activities (L5/L6),spanning multiple engineering disciplines
-civil, piping, static/rotating equipment, electrical, instrumentation, HSE- each executing and reporting in parallel. While the baseline plan is well-structured (Primavera/MS Project), actual execution data flows back through daily progress reports, site diaries, discipline-wise spreadsheets, and verbal supervisor updates, each in its own format and cadence, largely disconnected from the L5/L6 activity IDs in the plan.
•Problem Description There is no reliable, low-friction mechanism to capture actual start/end times of L5/L6 activities across disciplines and auto-link them back to the plan. Input quality varies with manpower skill, reporting discipline, and format.Field execution is often more granular than the planned WBS, and different disciplines describe the same physical progress differently (e.g., 'spool erected' vs. the plan's 'Erect Line 24?-XX').Consequently:

? Actual progress data is fragmented, delayed, and inconsistently structured across disciplines and contractors.

? Manual reconciliation with the baseline schedule is slow, error-prone, and often lags the schedule update cycle by days or weeks.

? Downstream performance analytics, delay/ risk analysis, and forecasting inherit this poor-quality, late data- undermining the AI performance-monitoring stack that depends on it.

? Once a project closes, the hard-won knowledge of what actually happened

-real durations, real bottlenecks,real deviations from plan
-is rarely captured in a structured, queryable form, so it is lost rather than feeding future project planning.
•Expected Outcome/Solution ? Ingest heterogeneous discipline-wise inputs
-free-text daily reports, spreadsheets, scanned diaries,Primavera/MS Project exports
-and extract activity-level actual start/end events.

? Offer an LLM-based conversational or voice interface ('time agent') for site supervisors across disciplines to log activity start/end with minimal friction, replacing rigid manual forms while still producing structured output.

? Fuzzy-match and link extracted discipline-specific activity descriptions to the correct L5/L6 plan node,handling terminology differences and granularity mismatches, and flag unmatched/new activities for planner review rather than silently dropping them.

? Auto-update actual start/end dates in the schedule/PMIS in near real time, with a confidence score and audit trail per entry.

? Produce a clean, structured, discipline-tagged actual-progress dataset that serves two purposes: (a) live input for performance analytics, delay/risk pattern discovery, and forecasting, and (b) a foundation for institutional memory building

-a growing, queryable repository of real project execution patterns (actual durations, recurring delay causes, discipline-wise productivity) that future projects can learn from, instead of that knowledge staying locked in individual supervisors' experience or scattered paper records.

A working prototype demonstrating ingestion of 2–3 varied input formats (e.g., a free-text daily report and a discipline spreadsheet), extraction, and schedule-linking logic would be ideal; full production-grade OCR/ASR is not required.

•Relevant Data Availability Anonymized/ sample daily progress report formats, sample L5/L6 schedule extracts, and illustrative discipline-wise (civil/ piping/ electrical) site-diary or spreadsheet templates can be shared under NDA with Institute/ Authorised person. Live project data will not be shared; teams should work with synthetic/sample data of similar structure.